|
Crews with the bridge replacement work along Interstate 70 at Route AA/BB in Grain Valley will be switching to Phase 2 traffic control beginning at 8 p.m. on Friday, July 7. This will require the following traffic changes. Motorists are advised to plan ahead and be vigilant of work in the area. All work is weather permitting.
Friday, July 7
This project will be constructed over the course of three phases in the next year. Phase 1 included bridge work and work within the median. Phase 2 will address the westbound side of the project and Phase 3 will address the eastbound side. The project is anticipated to be complete by winter 2023. Motorists are reminded to slow down and pay attention while driving in work zones. Not all work zones look alike. Work zones can be moving operations, such as striping, patching or mowing. They can also be short term, temporary lane closures to make quick repairs or remove debris from the roadway.
Terry Beebe
7/6/2023 02:20:28 pm
thank you for positing the information Comments are closed.
|
Categories
All
Archives
April 2024
|
Grain Valley NewsGrain Valley News is a free community news source published weekly online. |
Contact Us |